شما هنوز به سایت وارد نشده اید.
جمعه 14 اردیبهشت 1403
ورود به سایت
آمار سایت
بازدید امروز: 23,497
بازدید دیروز: 21,025
بازدید کل: 151,945,554
کاربران عضو: 1
کاربران مهمان: 85
کاربران حاضر: 86
نمایش مقالات انگلیسی با موضوع: مدیریت پروژه تعداد : 25
11. Solving project scheduling problems with resource constraints via an event list-based evolutionary algorithm
Source: Expert Systems with Applications 39 (2012) 3983–3994
Authors: .
No of Pages: 12
Price (Tomans): 0
Abstract | Download
12. MRA-based revised CBR model for cost prediction in the early stage of construction projects
Source: Expert Systems with Applications 39 (2012) 5214–5222
Authors: .
No of Pages: 9
Price (Tomans): 0
Abstract | Download
13. Modelling group processes and effort estimation in project management using the Choquet integral: An MCDM approach
Source: Expert Systems with Applications 39 (2012) 13366–13375
Authors: .
No of Pages: 10
Price (Tomans): 0
Abstract | Download
14. Hybridizing a multi-objective simulated annealing algorithm with a multi-objective evolutionary algorithm to solve a multi-objective project scheduling problem
Source: Expert Systems with Applications 40 (2013) 2421–2434
Authors: .
No of Pages: 14
Price (Tomans): 0
Abstract | Download
15. Extraction of decision alternatives in construction management projects: Application and adaptation of NSGA-II and MOPSO
Source: Expert Systems with Applications 39 (2012) 2794–2803
Authors: .
No of Pages: 10
Price (Tomans): 0
Abstract | Download
16. Evolutionary optimization of model specification searches between project management knowledge and construction engineering performance
Source: Expert Systems with Applications 40 (2013) 4414–4426
Authors: .
No of Pages: 13
Price (Tomans): 0
Abstract | Download
17. A novel dynamic progress forecasting approach for construction projects
Source: Expert Systems with Applications 39 (2012) 2247–2255
Authors: .
No of Pages: 9
Price (Tomans): 0
Abstract | Download
18. A hybrid estimation of distribution algorithm for solving the resource-constrained project scheduling problem
Source: Expert Systems with Applications 39 (2012) 2451–2460
Authors: .
No of Pages: 10
Price (Tomans): 0
Abstract | Download
19. A hybrid genetic algorithm for the discrete time–cost trade-off problem
Source: Expert Systems with Applications 39 (2012) 11428–11434
Authors: .
No of Pages: 7
Price (Tomans): 0
Abstract | Download
20. Project scheduling under uncertainty using fuzzy modelling and solving techniques
Source: Engineering Applications of Artificial Intelligence 26 (2013) 135–149
Authors: .
No of Pages: 15
Price (Tomans): 0
Abstract | Download
1 2 3